Hotels & resorts

Biofit helps hotels and resorts deliver wellness facilities that are unique selling points and operationally robust—from spa and recovery concepts to gyms and wellness studios. We support owners, operators and design teams with pre-design planning, concept development, interior design, technical specification and pre-opening support.

Ikosn Odissia gym - Biofit

Image credit: Ikos Odissia Resort, Greece (cardio machines by Technogym, strength machines by Watson)

email us about your project

Our services

Hotel wellness facilities we design

Hotel gyms & fitness centres

Destination spas & thermal suites

Recovery spas & longevity zones

Back of house (storage, linen, staff flow)

Relaxation lounges & changing rooms

Outdoor gyms & yoga decks


CASE STUDIES

Below are selected hotel and resort projects showing how Biofit supports planning, concept, design and delivery—tailored to each asset’s positioning, guest profile and operational model.

La Tour d’Eole, Dakhla, Morocco

La Tour d'Eole eco-lodge Morocco - gym - Biofit

Image credit: La Tour d’Eole

ECo-LODGE HOTEL CASE STUDY

Background: This outdoor wellness themed eco-lodge in Morocco currently has no gym for guest use, so we are developing a fitness space carefully tailored to this specific audience, their training preference and recovery needs.

Role: Gym consultant

Scope: Pre-design planning + concept development + equipment selection for indoor gym + wellness studio.


Client: La Tour d’Eole

Timeline: 2026

La Tour d’Eole, Sao Bento, Cape Verde

La Tour d'Eole

Image credit: La Tour d’Eole

ECo-LODGE HOTEL CASE STUDY

Background: After the success of his first resort in Morocco, the owner and CEO of La Tour d’Eole is developing a site in Cape Verde with a similar outdoor wellness concept. The gym concept is to be developed at brand level first and then applied, with minor modifications, in each We are collaborating withof the two resorts.

Role: Gym consultant

Scope: Pre-design planning + concept development + equipment selection for indoor gym


Client: La Tour d’Eole

Timeline: 2026

Conrad Hilton Wellness Club, Al Khobar, Saudi Arabia

Refad, Miraf District, Saudi Arabia - Biofit

Image credit: Refad Real Estate

LUXURY HOTEL CASE STUDY

Background: We work with developer Refad Real Estate on their Miraf District, a mixed-use development in Al Khobar, Saudi Arabia. Specifically, our role relates to the Conrad Hilton luxury hotel’s wellness club, open to outside members and hotel guests.

Role: Gym + spa consultant

Services: Pre-design planning + concept development + equipment selection for a 3500m2 social wellness club open to external members as well as hotel guests.


Client: Refad Real Estate, Saudi Arabia

Operator: Conrad (Hilton)

Timeline: 2025-26

Sao Felix Wellness Hotel, Portugal

sao felix wellness resort portugal

Image credit: Sao Felix Hotel, Portugal

WELLNESS RESORT CASE STUDY

Background: We were asked to help conceptualise and space plan all indoor and outdoor wellness facilities for a re-imagined, destination wellness resort with a strong longevity angle for what is currently the Sao Felix Hotel in Portugal, owned by RINA Group.

Role: Gym, spa & wellness consultant

Services: Pre-design planning + concept development for spa, recovery and gym facilities, including capacity assumptions, zoning logic and early technical coordination inputs for over 2000m2 of wellness facilities in total.


Outcome: Clear programme and planning brief aligned to service level, enabling faster approvals and cleaner coordination with interior design and MEP teams.


Client: RINA Group, Lisbon

Timeline: 2025

Aleenta Resort Spa, Phuket, Thailand

Aleenta Resort Phuket spa Thailand

Image credit: Aleenta Resort Spa, Phuket, Thailand

BOUTIQUE RESORT CASE STUDY

Background: The owner of Aleenta Phuket wanted to convert a number of available spaces in the resort’s existing spa into functional spa / biohacking concepts. We advised on the range of viable options, finally selecting a float tank, infrared sauna and ice baths.

Role: Spa consultant

Scope: Pre-design planning + concept development + equipment selection for new functional spa experiences with float tank, infrared sauna and ice bath.


Client: Aleenta Resorts

Timeline: 2024

Sani Resort gyms, Greece

Image: Sani Beach, outdoor gym

LUXURY RESORT CASE STUDY

Background: We worked with Sani Resort (and all Ikos Resorts within the same group) on an ongoing retainer contract delivering strategic advice at group / C-suite level as well as designing individual gym and fitness concepts around the resort (both new and existing).

Role: Strategic fitness advisor + gym consultant

Services: Pre-design planning + concept development + equipment selection for gym facilities.


Outcome: Enhance gym experiences for all guests, in each of the distinct hotels within the mega resort, and an enhanced wellness offering overall.


Client: SANI Resort, Greece (reporting to the Director of Sports & Recreation)

Timeline: 2021-2023

Ikos Kissamos Resort gym, Greece

Images: Initial gym zoning and space plan with equipment layout

LUXURY RESORT CASE STUDY

Background: We worked with Ikos Kissamos as part of our strategic partnership to conceptualise, plan and equip the new-build, indoor-outdoor gym overlooking the resort pool.

Role: Gym consultant

Services: Pre-design planning + concept development + equipment selection


Outcome: A market-leading resort gym offer that provides Kissamos with the advanced gym concept on the island of Crete, positioning it at the very top of the local market for health and wellness experiences.


Client: Ikos Kissamos Resort, Greece (reporting to the Director of Sports & Recreation)

Timeline: 2023-24

Ikos Andalusia Resort gym, Spain

Ikos Andalusia Villa Gym - Biofit

Image credit: Ikos Andalusia private villa gym

LUXURY RESORT CASE STUDY

Background: We worked with Ikos Andalusia as part of our strategic partnership to conceptualise, plan and equip an outdoor gym for functional training as well as a collection of private villa gyms for luxury guests.

Role: Gym consultant

Services: Pre-design planning + concept development + equipment selection for outdoor gym and villa gyms.


Outcome: Enhanced resort gym user capacity thanks to a new functional training outdoor gym as well as high-end private villa gyms to enhance the villa guest experience.


Client: Ikos Andalusia Resort, Spain (reporting to the Director of Sports & Recreation) in collaboration with our friends at Studio Gronda, Madrid.

Timeline: 2023-24

Ikos Cortesia Resort, Portugal (opening 2028)

Image: our space plan for Ikos Cortesia’s future gym showing cardio, functional and strength training zones

LUXURY RESORT CASE STUDY

Background: We worked with the Ikos Resorts team on the early space-planning and concept development for the forthcoming Ikos Cortesia, the brand’s first location in Portugal.

Role: Gym consultant

Services: Pre-design planning + concept development + equipment selection


Client: Ikos Cortesia, Algarve, Portugal (reporting to the Director of Sports & Recreation) in collaboration with our friends at Studio Gronda, Madrid.

Timeline: 2024

Ikos Odisia, Greece

Ikos Odisia Gym - Biofit

Image credit: Ikos Odisia

LUXURY RESORT CASE STUDY

Background: We worked with the Ikos Resorts team on the planning, concept development and equipment selection for a new resort gym featuring premium cardio, functional and strength training zones in a light-filled gym space that lets the outside world in via floor to ceiling windows.

Role: Gym consultant

Services: Pre-design planning + concept development + equipment selection

Outcome: A world-class resort gym experience in a tranquil, nature-inspired setting combined with a customized equipment selection aligned to the Ikos brand colours.


Client: Ikos Odisia, Greece (reporting to the Director of Sports & Recreation)

Timeline: 2023-24

Ikos Porto Petro Resort, Mallorca, Spain

ikos porto petro gym - biofit

Image: our customized strength equipment selection for Ikos Porto Petro in Mallorca.

LUXURY RESORT CASE STUDY

Background: We worked with the Ikos Resorts team on the planning, concept development and equipment selection for the new-build Ikos Porto Petro’s indoor and outdoor gyms in Mallorca, Spain (opened 2024).

Role: Gym consultant

Services: Pre-design planning + concept development + equipment selection for indoor and outdoor resort gyms.

Outcome: A world-class resort gym offering that includes an extensive indoor gym, as well as an outdoor functional rig and a separate, fully independent outdoor gym.


Client: Ikos Porto Petro, Algarve, Portugal (reporting to the Director of Sports & Recreation) in collaboration with our friends at Studio Gronda, Madrid.

Timeline: 2024

Las Terrazas Resort, Belize

Las Terrazas Resort, Belize

Image credit: Las Terrazas Resort, Belize

BEACH RESORT CASE STUDY

Background: We were asked to conceptualize, plan and equip a new outdoor gym on an under-utilized section of the resort beach, providing a much-needed gym facility for guests.

Role: Gym consultant

Scope: Pre-design planning + concept development + equipment selection for outdoor gym.


Client: Las Terrazas

Timeline: 2024

Ikos Olivia Resort, Kos, Greece

IKOS Olivia beach gym by Biofit

Image: IKOS Olivia beach gym by Biofit

LUXURY RESORT CASE STUDY

Background: We worked with the Ikos Resorts team on the planning, concept development and equipment selection for a new outdoor beach gym.

Role: Gym consultant

Services: Pre-design planning + concept development + equipment selection for outdoor beach gym.

Outcome: A unique selling point that provides a complete functional training experience with a sea view, immersed in nature. We used a customised gym container to provide on-site storage, incorporated a shade structure and poured a concrete slab to provide a solid base underfoot.


Client: Ikos Olivia, Greece (reporting to the Director of Sports & Recreation)

Timeline: 2023-24

Ikos Aria Resort, Kos, Greece

Ikos Aria outdoor gym design - Biofit

Image: our outdoor gym at Ikos Aria designed by functional training

LUXURY RESORT CASE STUDY

Background: We worked with the Ikos Resorts team on the planning, concept development and equipment selection for a new outdoor gym.

Role: Gym consultant

Services: Pre-design planning + concept development + equipment selection for outdoor resort gym.

Outcome: An extended gym user capacity and an enhanced overall fitness offer.


Client: Ikos Aria, Greece (reporting to the Director of Sports & Recreation)

Timeline: 2023

ZEL Hotel, Mallorca, Spain

Image: ZEL Mallorca wellness studio, concept design by Biofit

BOUTIQUE HOTEL CASE STUDY

Background: Melia Hotels brought us in to advise on the wellness strategy for their new boutique hotel brand in association with tennis star Rafa Nadal. We initially defined a number of key brand concepts such as the role of biophilic design in Zel hotel interiors, before conceptualising the brand’s first gym and wellness studio.

Role: Gym + wellness consultant

Services: Pre-design planning + concept development + equipment selection for indoor gym + wellness studio.


Client: Melia Hotels International

Timeline: 2023

Singita Mara River tented camp gym, South Africa

Singita Mara River camp

Image credit: Singita Mara River

SAFARI LODGE CASE STUDY

Background: Having previously advised Singita on their Sabi Sand property gyms, we were called back in 2023 to lead the creation of an outdoor exercise area for guest use. Given the remote location, no equipment could be flown in, so we designed a set of bodyweight training obstacles that could be built on-site using local materials.

Role: Gym consultant

Scope: Pre-design planning + concept development + equipment design for local production and installation


Client: Singita Safari Lodges

Timeline: 2023

Fritton Lake Hotel & Members Club, Norfolk, UK

Image credit: Edvinas Bruzas for Fritton Lake Hotel

BOUTIQUE HOTEL CASE STUDY

Background: Lord Somerleyton, owner of Fritton Lake Hotel & Members Club, brought us in to create a new barn gym to enhance the member experience. Fully immersed in nature, and with a range of outdoor activities such as trail running and cold water swimming already available, we used biophilic design to bring the outside world in and curated a selection of gym equipment oriented around natural materials such as wood and leather.

Role: Gym consultant

Scope: Pre-design planning + concept development + equipment selection for indoor gym + wellness studio.

Outcome: A thriving fitness and wellness facility used by local members and hotel guests alike. Studio classes take place in one section of the space while the permanent equipment for strength and cardio sits at the other end.


Client: Fritton Lake Hotel

Timeline: 2021

Tearose Hotel, Monza, Italy

Image credit: Tearose Monza (boutique, cafe, hotel, gym)

BOUTIQUE HOTEL CASE STUDY

Background: Initial concept development, planning and equipment selection for a hotel gym and adjacent yoga studio working with the in-house architect and brand owner at their historic Monza site.

Role: Gym consultant

Scope: Pre-design planning + concept development + equipment selection for indoor gym + yoga studio.


Client: Tearose

Timeline: 2020

Tearose Hotel, Florence, Italy

Tearose Hotel Il Salviatino, Florence, Italy

Image: Tearose Il Salviatino Hotel, Florence, Italy

BOUTIQUE HOTEL CASE STUDY

Background: Tearose own the already operational Il Salviatino Hotel in Fiesole, just outside Florence. The brief was to assist with the development of an upgraded hotel wellness offer, with a new indoor gym, outdoor gym and outdoor yoga deck.

Role: Gym consultant

Scope: Pre-design planning + concept development + equipment selection for indoor gym + yoga studio.


Client: Tearose

Timeline: 2020

Singita Sabi Sand (Ebony & Boulders) safari lodges, South Africa

Image credit: Singita Boulders

BOUTIQUE HOTEL CASE STUDY

Background: We were tasked with a complete uplift of the gym equipment offer at Singita Ebony and Singita Boulders lodges as part of a general push to upgrade the brand’s gym experience.

Role: Gym consultant

Scope: equipment review / selection


Client: Singita Safari Lodges

Timeline: 2018-19

Why use Biofit for hotel wellness?

Operational credibility: planning logic, guest journey and service level are built into the design from the start.

Coordination-ready outputs: schedules, technical requirements and clear documentation that reduces redesign and site issues.

Modern wellness positioning: traditional spa environments and newer recovery/longevity offerings planned as one coherent guest experience.

Flexible engagement: full interior design delivery, or specialist advisory support alongside an appointed design team.

I enjoy nothing more than helping hospitality brands develop high-performing and HIGHLY DIFFERENTIATED wellness assets

– Matt Aspiotis Morley

FAQ

  • Yes. We support the planning and design of hotel spas, recovery/longevity areas, thermal suites (where included), gyms and studios—either as a full design team or as specialist advisors alongside your appointed consultants.

  • Yes. We regularly support multi-stakeholder hotel teams by clarifying programme mix, layouts, equipment requirements and coordination priorities—helping the wider team deliver a consistent wellness experience.

  • Ideally during pre-design or early concept—before layouts and MEP strategies become difficult to change. Early engagement reduces redesign risk and supports better budget accuracy.

  • Yes. We plan facilities that combine treatment-led spa environments with modern recovery/longevity offerings, ensuring zoning, privacy, circulation and operational logic support the intended service model.

  • No, we are not an equipment manufacturer or supplier. We act independently to specify and coordinate equipment requirements from a broad range of specialist brands. Procurement can be handled by the client, contractor or nominated supplier, depending on the tender strategy. We can also manage this process ourselves, in certain cirumstances.

  • Yes. We provide pre-opening inputs such as operating model considerations, staffing/workflow logic, service standards alignment and readiness planning to support a smooth launch.


Planning a hotel or resort wellness facility?

Share your plans and a short brief. We’ll recommend a practical scope—from early planning and concept to design, specification and pre-opening support—aligned to your brand, guest profile and operational model.